Cambridge Busway

Design intent

A bespoke solution to separate and segregate
the access track from the busway.

Design

Building a resilient, safe solution incorporating
a suitable height of modular fencing with access
points to allow for emergency services.

Design reality

Protecting the road-user community for decades
to come.

Access

More and more, clients are asking KITE Projects to deliver solutions, that not only go beyond safety compliance, but meet sustainability criteria too.

KITE Projects meet these challenges by working collaboratively with all stakeholders, as we recognise that infrastructure projects must be responsible to the communities they serve. The Cambridge busway project had this focus, where it is integral the scheme supports connecting communities – be that for work, leisure or play.


Measures of success included:

  • Facilitate access to the wider environment to help enable healthy lifestyles

  • The solution must improve pedestrian safety and protect people from harm

  • Meet legal obligations regarding health and safety

  • Provide a long-lasting solution with long design life

  • Contribute to Cambridge’s sustainability and net zero ambitions


The solution included:

  • Extensive surveys to ensure scope viability and solution functionality

  • Presenting different design options within a fixed design cost framework

  • Bespoke height design to suit location circumstances and other bespoke features to enable mammal access and egress

  • Purpose made installation jig, to improve efficiency for installation by hand

  • Galvanised finish on fence, with yellow powder coating as an enhanced safety features on 180degree foldback gates

  • Compliant specification to meet BS7818 standard