top of page
Iron Bridge London
Design intent
Solution close to trackside requires collaborative engineering
Design
Teams able to work and access trackside safely
Design reality
Cost effective solution with longevity
Access
KITE Step proves time and again, that good design and responsible use of materials creates a solution that will stand the test of time.
Utilising multi components across the KITE System range, this scheme demonstrates the benefits of involving KITE Projects in the design and manufacture of a system, to ensure that the complexities of the site can be addressed in ways that are not only cost effective, but also that can be installed with minimum impact.
Project Gallery
bottom of page